1) Yongfang Huang , Tieqiang Gang, and Lijie Chen. Interacting Effects Induced by Two Neighboring Pits Considering Relative Position Parameters and Pit Depth. Materials, 2017, 10, 398
2) W.W. Xu, S. L. Shang, C. P. Wang, T. Q. Gang, Y. F. Huang, L. J. Chen, X. J. Liu, Z. K. Liu*. Accelerated exploitation of new Co-Al-based superalloys from a computational investigation Volume 142, 15 March 2018, Pages 139-148
3) Wei Cheng, Gang Tie-Qiang, Chen Li-Jie, Z hao Yang , Critical condition for the transformation from Taylor cone to cone-jet, Chinese Physics B, 2014, 23(6), 064702
4) Tieqiang Gang, Lijie Chen, Optimized parameter estimation method in creep data processing and relaxation of test conditions, Journal of Strain Analysis for Engineering Design, 2010, 45 (4): 223-231
5) T. Q. Gang, F. X. Mei, L. J. Chen, Structure-preserving algorithms for the Lorenz system. Chin. Phys. Lett, 2008, 25(3): 866-869
6) T. Q. Gang, F. X. Mei, J. F. Xie, Structure-preserving algorithms for the Duffing equation. Chin. Phys. B, 2008, 17(10): 3623-3628
7) T. Q. Gang, F. X. Mei, L. J. Chen, Poincaré map based on splitting methods. Chin. Phys. Lett, 2008, 25(11): 3886-3889
8) T. Q. Gang, L. J. Chen, F. X. Mei, The algorithm based on the gradient-Hamilton decomposition theory of vector fields. J of Beijing Institute of Technology, 2009, 18(4): 408-411
1) 国家自然科学基金面上项目,夹杂物处疲劳裂纹萌生寿命的多尺度预测方法,2015/01-2018/12,84万元,参与
2) 北京航空材料研究院委托,高强铝合金预腐蚀疲劳性能试验研究,2011/01-2014/12,85万元,参与
3) 中航集团产学研项目,2013/10-2017/12,120万元,参与
4) 973计划(2013CB733004)”子课题委托项目,空间组合式航天器动力学及大柔性结构动力学分析,2016/06-2016/12,25万,主持
5) 973计划(2013CB733004)”子课题委托项目:机械臂试验平台及关节壳体改造与测试,2015/06-2016/06,19.6万,主持
6) 973计划(2013CB733004)”子课题委托项目:机械臂试验平台相关焊接及设备安装与测试,2015/12-2016/12,19.8万,主持